Skip to content
← All services

Remodels and Additions

Most of our work. Modern transformations of houses that are already standing.

Kitchens, baths, additions, ADUs, and whole-home renovations — architecturally aligned, meaning the new work looks like it belongs to the house rather than bolted onto it. This is the bulk of what we do and what our permit history is built on. If your house was built between 1990 and 2010 and everything in it is builder-grade, this is the conversation.

What's included

  • Kitchen and bathroom remodels
  • Additions and architecturally aligned expansions
  • Accessory dwelling units
  • Whole-home renovations
  • Exterior upgrades and water system work

What isn't

  • Emergency repair and restoration work
  • Handyman-scale single-item jobs

How it goes

  1. Step 1

    Walk the house

    We look at what you have and what is behind it.

  2. Step 2

    Scope and a real range

    Written, with the assumptions stated.

  3. Step 3

    Selections

    The part that moves the number most. We do it before we start, not during.

  4. Step 4

    Build

    Dust control, a schedule, and a crew who cleans up.

  5. Step 5

    Walkthrough

    Punch list closed before we ask for the last payment.

Questions we actually get asked

What does a kitchen remodel cost around here?
It depends far more on selections and on what is behind the walls than on square footage, so we do not publish a number we would have to walk back. We walk the house, then give you a written range with the assumptions stated so you can argue with them.
Can we live in the house during the work?
Usually for a single-room remodel, rarely for a whole-home renovation. We will tell you honestly which one yours is.
How far out are you booking?
Call and ask — it changes, and a stale answer on a website helps nobody.